Production ramp-up is the critical phase between pilot and mass production. A small error can cause significant losses. Therefore, it is essential to ensure that all systems, processes, and equipment are technically validated before starting scale production.

The production ramp-up is the critical phase between the pilot and mass production. A small error can cause significant losses. Therefore, it is essential to ensure that all systems, processes, and equipment are technically validated before starting scale production.

A safe ramp-up starts with a well-structured technical checklist. And ends with stable, reliable, and traceable production.


📋 Why use a technical checklist?

  • Reduces operational risks and rework
  • Ensures compliance with specifications and quality standards
  • Improves communication between engineering, production, quality, and maintenance
  • Facilitates audits and internal releases (NPI, PPAP, ISO)

🧠 What to validate before ramp-up?

🔌 1. Equipment and test benches

  • All operational jigs, with sensors, actuators, and interlocks tested
  • Calibrated instrumentation (sources, multimeters, cameras, pressure switches…)
  • Validated software: sequences, scripts, PLC
  • Communication OK with the DUT (Ethernet, RS-485, CAN, UART, RF, Wi-Fi, etc.)

🧰 2. Process quality

🧪 3. Materials and supplies

  • Bill of materials (BOM) reviewed and approved
  • Correct components with batch and validity
  • Validated suppliers with tested deliveries
  • Organized stock with FIFO and traceable batch

🧾 4. Traceability

  • Integration with systems (MES, database, ERP)
  • Automatic recording of serial number, results, operator, timestamp
  • Test reports (PDF, XML, database) generated and archived correctly

👷 5. Operators and ergonomics

  • Operators trained and certified at the stations
  • Workstations with ergonomics NR-12, lighting, and layout 5S
  • Production simulations at real pace with team feedback

🏭 How AJOLLY Testing supports your line’s ramp-up

At AJOLLY Testing, we apply standardized technical checklists in all automation projects, with validations that include:

  • Functional testing of all tester channels
  • Pilot data analysis with FPY, CPK, cycle time charts
  • Creation of ramp-up control dashboards
  • Complete simulation with Golden unit
  • Field support during line release

📌 PDF checklist available on demand

Want a customizable technical checklist template for your project? AJOLLY Testing delivers it along with the complete system technical documentation.


Ramp-up without a checklist is like taking off without checking the engines. Do it right from the start — with engineering, traceability, and technical validation.